Preparation matters before operation of cooling water tower

2023-11-20


1) Remove foreign matter from the side of the air inlet or around the wind carcass.

Preparation matters before operation of cooling water tower:

1) must be into the air inlet side or the wind carcass around the exclusion of foreign objects;

2) Make sure that there is enough clearance between the tail of the windmill and the wind carcass to avoid damage during operation.

3) Check whether the V-belt of the reducer is properly adjusted.

4)The position of V-belt pulleys must be kept at the same level with each other.

5) After the above check is completed, start the switch intermittently to check whether the windmill is running in the right way? And whether there is abnormal noise and vibration?

6) Remove the debris inside the hot water disk and tower body.

7) Remove the dirt and foreign matter inside the hot water disk, and then fill up the water to the overflow position.

8)Start the circulating water pump intermittently, remove the air from the pipe, until the pipe and the cold water disk is full of circulating water; 9)When the circulating water pump is started, remove the air from the pipe, until the pipe and the cold water disk is full of circulating water.

9) When the circulating water pump operates normally, the water level in the cold water plate will drop slightly, then you must adjust the float valve to a certain water level.

10) Circuit system, re-confirm the circuit switch, fuse and wiring specifications match the motor load.

Key words:

Previous: